135 A project execution is usually divided into some elementary phases, such as :engineering, procurement and transportation, and field construction.
一个工程项目的推行一般可分为几个基本阶段:工程设计、采购和运输、与现场施工。
136 We are building an ethylene plant with an annual capacity of 300,000 metric tons.
大家正在建设一座年产三十万吨的乙烯工厂。
137 The contract number of this project is CJC78-8.
这个项目的合同号是CJC78-8。
138 The Seller is Toyo Engineering Corporationof Japan.
卖方是日本的东洋工程公司。
139 The Buyer is China National Technical import Corporation.
买方是中国技术进口总公司。
140 China National Chemical Construction Corporation contracts for domestic and overseas chemical projects. 中国化工建设总公司承包国内和国外的化工工程。
141 We can contract to build turn-key plant, undertake single items of projects as a subcontractor or provide labor services. 大家可以承建成套工厂或分包单项工程或提供劳务。
142 The “UHDE” Corporation of Federal Germany takes part in this project as a patent licenser.
联邦德国的“伍德”公司作为一个技术专利执证者参加此项工程。
143 Are you the Seller’s Representative on the job site?
你是卖方的现场代表吗?
144 I am the Buyer’s General Representative.
我是买方的总代表。
145 It is an inquiry about this project.
这是这个项目的询价书。
146 There are many information in the technical proposal, which including: process flow, process description, capacity of the plant, performance of the product.
技术价格书中有不少资料,包含:工艺步骤、工艺说明、生产能力、商品特质等。
147 There are two units in the contract plant.
在合同工厂内有两个车间。
148 The project team normally consists of project engineer, design engineer, schedule engineer, and various specialists.
项目工作组一般包含有项目工程师、设计工程师、计划工程师、与各类专家。
149 We can evaluate the results of field construction by four criteria, which are quality, time, cosplayt and safety.
大家可以通过四个指标来评价现场施工的成绩,即水平、时间进度、成本和安全。
150 I am responsible for the technical work of this project.
我负责这个项目的技术工作。
151 Would you tell us the technical characteristic about this project?
你能告诉大家有关这个工程项目的技术特质吗?
152 Please give a description about this project.
请对这个工程项目作一个叙述说明。
153 The project is certain to be a success.
这个项目必然会得到成功。
154 Do you have any reference materials about this project?
你有关于这个工程项目有参考资料吗?